Blog Operations

Samgook Tour Blog Management Status

Per-post publication status and search visibility are queried live from the website RSS/sitemap, the public Naver post list, Google Search Console, and GA4. Unconnected data is shown as not connected, never estimated.

Post and search data are queried live

Contract period

Aug 24, 2026 - Sep 22, 2026 (30 days from service start)

Remaining contracted posts are still being delivered after the period end.

Contracted content

20 posts

Overseas culture tour and package guides

Completion rule

Live on both channels

A post counts as complete only when both the Naver and website public URLs are verified. Website-only posts are shown separately in the live ledger below.

Search optimization review record

SEO, AEO, and GEO items reflect the review record as of 2026-10-11 21:44 KST. Newer posts appear in the live ledger below first.

SEO
20 posts reviewed
Primary queries, search titles, descriptions, canonical URLs, and internal links.
AEO
20 posts with answer structure
Direct answers, itinerary comparison criteria, FAQ, and structured data.
GEO
20 posts with local context
Jeonju/Busan/Cheongju departure, business address, and contact context.

Live Post Ledger

Per-post publication and search visibility ledger

Website RSS/sitemap, the public Naver post list, Google Search Console page totals, and GA4 are queried live on every load. Failed sources are shown as failed, never estimated.

Querying public channels and analytics.

Search & Analytics

Search traffic and analytics status

Only publishable aggregates and search infrastructure checks are shown. Disconnected data is never estimated.

Checking the latest status.

Publication Status

Public channel publishing and sync

Counts include only posts currently verified in public RSS feeds after the stated date. Missing feed history is not estimated.

Checking public feeds.